How master data changes in source lists, lead times, safety stock, and quota arrangements determine whether a supply chain survives disruption or collapses under pressure.
Toggle between phases to see how master data changes ripple through the entire network.
Single-sourced from Samsung with 20-week lead times. Standard safety stock of 70 units and reorder point at 160. The supply chain operates within normal parameters with predictable costs and acceptable service levels, but hides a critical concentration risk in the DRAM commodity.
Grouped comparison of cost components across all three phases.
Field-level SAP master data changes that drive each scenario.
| SAP Field | Baseline | Crisis | Mitigated |
|---|---|---|---|
| Source List (vendors) | 1 | 1 | 3 |
| Info Record Lead Time | 20 wks | 40 wks | 12-20 wks weighted |
| Info Record Unit Price | $4.50 | $7.20 | $4.50 - $6.50 |
| MRP Safety Stock | 70 | 70 | 140 |
| MRP Reorder Point | 160 | 160 | 280 |
| Quota Arrangement | 100 / 0 / 0 | 100 / 0 / 0 | 40 / 35 / 25 |